Turnkey Hospital Infrastructure Services
Six clinical spaces, each designed to a named standard and handed over with its test and validation evidence — whether you are building new, expanding, or upgrading one unit.
What We Build
Each service page covers scope, standards, layout, indicative cost and the questions hospitals ask before committing.
Modular Operation Theatre
NABH-compliant turnkey modular OTs with HEPA filtration, hermetic doors, and laminar airflow for sterile surgical environments.
Medical Gas Pipeline System
HTM 02-01 and NFPA 99 compliant medical gas pipeline systems for oxygen, vacuum, nitrous oxide and medical air across hospitals.
ICU Setup
Complete turnkey ICU infrastructure — design, equipment, HVAC, and isolation rooms — built to NABH and ISCCM standards.
Dialysis Unit Setup
End-to-end dialysis center setup including RO water treatment plant, dialysis machines, and AAMI-compliant infrastructure.
Cath Lab Setup
Cardiac catheterization lab construction with radiation shielding, AERB compliance, and integrated imaging infrastructure.
Medical College Setup
NMC-compliant medical college turnkey projects — teaching hospital, academic labs, hostels, and full infrastructure.
Services compared: standard and indicative cost
Every figure is an indicative planning range from our published guides, not a quotation. Final pricing follows a site survey and a written scope.
| Service | Designed to | Indicative cost | Cost guide |
|---|---|---|---|
| Modular operation theatre | NABH · ISO 14644 | ₹30 lakh – ₹1 crore+ per theatre | Modular operation theatre cost guide |
| Medical gas pipeline system | HTM 02-01 · NFPA 99 · ISO 7396-1 | Scales with outlet count and source plant | Medical gas pipeline system cost guide |
| ICU setup | ASHRAE 170 · NABH | ₹8–25 lakh per bed, by level of care | ICU setup cost guide |
| Dialysis unit | AAMI / ISO 23500 | ₹1.0–1.85 crore for 10 stations (new machines) | Dialysis unit cost guide |
| Cath lab | AERB | Infrastructure from ₹75 lakh, excluding the imaging system | Cath lab cost guide |
| Medical college | NMC | ₹235–375 crore for 100 seats, excluding land | Medical college cost guide |
Projects often combine lines — a theatre block needs its medical gas, an ICU its gas and ventilation, a medical college all six. Holding them under one contract is what keeps the interfaces between them from becoming the defects found at audit.
Planning a hospital infrastructure project?
Talk to our team for a no-obligation consultation. We respond within 4 business hours.